Avera McKennan Hospital Campus - Sioux Falls, SD 

The Avera McKennan Hospital campus was relying on utility power to feed their campus. The total power generation project consisted of two (2) 2,250-watt, 13.8 KV emergency generators, new medium voltage parelleling switchgear, new medium voltage service distribution switchgear, connection to the existing campus loops, and provisions for three future generators. The project now provides reliable back-up power to the campus along with seamless soft-transition capabilities. 

Photo courtesy of Avera McKennan Hospital